CREAM PANTS Skill level: Easy SIZE MATERIALS GAUGE LEFT LEG With straight needles, cast on 17 sts. Ribbing: Row 1 (RS): K1, * p1, k1, rep from * across. Row 2: P1, * k1, p1, rep from * across. Rep these 2 rows until piece measures 1½” from beg, end on WS. Inc 1 st each end of next row – 19 sts. Work even until piece measures 2½” from beg, end on WS. Sl sts onto holder. RIGHT LEG Work same as left leg until piece measures 2½” from beg, end on WS – 19 sts. Joining Row (RS): Work across 17 sts of right leg, p2 tog, then work 19 sts of left leg from holder – 37 sts. Work even in ribbing as established until piece measures 3” from beg, end on WS. Dec Row (RS): Knit, dec 17 sts across – 20 sts. Beg with a p row, work even in St st for 6 rows, end on RS. Knit 2 rows. Bind off knitwise on WS. FINISHING Sew back seam to crotch. Sew inside leg seams, reversing seams over lower ½” of each leg. Fold lower ½” of each leg back to RS. Belt: With dpn’s, cast on 3 sts and work I-Cord as follows: Row 1: * K3, do not turn work. Slide sts to beg of needle to work next row from RS. Rep from * until cord measures 7” from beg. Fasten off. Fold top edge of pants down ¼”. Tie belt around top of pants below folded edge. .jpg)
Approximately 2’ across x 3” high
1 Ball BERROCO COMFORT DK (50 grs), #2703 Barley
Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGE
2 Double pointed knitting needles (dpn), size 4 (3.50 mm)
1 St holder
34 sts = 4”; 30 rows = 4” in k1, p1 ribbing on larger needles
TO SAVE TIME, TAKE TIME TO CHECK GAUGE
- one ben bir sey
- Well-mannered attitude and social minded outlook :))I normally be reluctant to make a stand with an outlandish idea or draw attention with an unusual outfit or hair style. 21 yesterday,21 today,21 tomorrow :)) If I am in danger of lives' weight and self- image issues .I respond these negative urges in a completely different way crushing them:))
Saturday, February 20, 2010
CREAM PANTS
posted by
one ben bir sey
time:
10:00 AM
Wednesday, February 10, 2010
GOLD CAPE
GOLD CAPE Skill level: Easy SIZE MATERIALS GAUGE CAPE With straight needles, cast on 50 sts. Row 1 (WS): K1, place marker, (k8, place marker) 6 times, k1. Row 2: Knit. Row 3: Purl. Row 4 (Dec Row): K1, sl marker, (k2 tog, k4, SSK, sl marker) 6 times, k1 – 38 sts. Row 5: Purl. Row 6: Knit. Row 7 (Dec Row): P1, sl marker, (p2 tog, k2, p2 tog TBL, sl marker) 6 times, p1 – 26 sts. Row 8: Knit. Row 9: Purl. Row 10 (Dec Row): K1 sl marker, (k2 tog, SSK) 6 times, k1 – 14 sts. Rows 11 and 13: Purl. Row 12 and 14 (WS): Knit, dropping markers. Collar: Row 1: Knit. Row 2: P2 tog, p to end - 13 sts. Row 3: K2 tog, k to end - 12 sts. Rep Rows 2 and 3 once more, then rep Row 2 once more – 9 sts. Next Row: K1, (k2 tog) 4 times – 5 sts. Bind off. FINISHING Edging: With RS facing, using crochet hook, join yarn in center of cast-on edge. Work in sc around entire cape, join with a sl st in first sc. DO NOT turn. Work from left to right in Reverse Sc around entire cape. Join with a sl st in first sc. Fasten off. Tie: With crochet hook, make a chain 10” long. Fasten off. Thread one end of tie through edging on one side of cape at base of collar, then thread the other end through edging on the opposite side of cape at base of collar. (Tie should run across RS of cape). Pull tie up snugly and tie in a bow, allowing collar to wrap down over tie. 
Approximately 8” around lower edge x 2½” high
1 Hank BERROCO LUMINA (25 grs), #1620 Gold Coast
Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGE
Crochet hook, size 4.00 mm (F)
7 St markers
22 sts = 4”; 30 rows = 4” in St st
TO SAVE TIME, TAKE TIME TO CHECK GAUGE
posted by
one ben bir sey
time:
10:00 AM
Sunday, January 31, 2010
PINK PULLOVER WITH SCARF
PINK PULLOVER WITH SCARF Skill level: Easy SIZE MATERIALS GAUGE NOTE Body of sweater is made in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs. SWEATER BODY With larger needles, using A, cast on 15 sts. Seed Stitch: Row 1 (RS): K1, * p1, k1, rep from * across. Rep this row until piece measures 2” from beg. Mark beg and end of last row for beg of armholes. Work even until armholes measure ½” Shape Neck: Next Row: Work 4 sts, bind off center 7 sts, work to end. Following Row: Work 4 sts, cast on 7 sts, work to end – 15 sts. Work even for ½”. Mark beg and end of last row for end of armholes. Work even until piece measures 2” above last markers. Bind off. SLEEVES With larger needles, using A, pick up and k11 sts along armhole edge between markers. Work even in Seed St for 1”. Bind off. FINISHING Fold sweater in half and sew side and sleeve seams. Neck Edging: With RS facing, using crochet hook, join A at center back neck. Work in sc around entire neck edge, join with a sl st in first sc. DO NOT turn. Work from left to right in Reverse Sc around entire neck edge, join with a sl st in first sc. Fasten off. Lower Edging: Beg at side seam, work same as neck edging. SCARF With smaller needles, using B, cast on 5 sts. Work even in St st for 8”, end on WS. Bind off. Fringe: Cut twenty-four 3” long strands of B. Put 4 strands tog and fold in half. Insert crochet hook in 2nd st of cast-on edge of scarf and pull fold through that st forming a loop. Draw free ends of strands through loop and tighten. In this manner, make fringe in center 3 sts on each end of scarf. Trim ends to even off if necessary.
Approximately 4¼” across (cuff to cuff) x 3” high
1 Ball BERROCO COMFORT DK (50 grs), #2730 Teaberry (A) for Sweater
1 Ball BERROCO COMFORT SOCK (100 grs), #1816 Cosmopolitan (B) for Scarf
Straight knitting needles, sizes 3 (3.25 mm) and 6 (4.00 mm) OR SIZE TO OBTAIN GAUGE
Crochet hook, size 4.00 mm (F-5)
22 sts = 4”; 38 rows = 4” in Seed St with A on larger needles
30 sts = 4”; 40 rows = 4” in St st with B on smaller needles
TO SAVE TIME, TAKE TIME TO CHECK GAUGE
posted by
one ben bir sey
time:
10:00 AM
Wednesday, January 20, 2010
Zigzag striped turtle neck sweter

.jpg)
6 ZIGZAG STRIPED TURTLENECK
Skill level: Intermediate
SIZE
Approximately 4½” wide (cuff to cuff) x 2½” high (with turtleneck rolled down)
MATERIALS
1 Ball each BERROCO COMFORT DK (50 grs), #2722 Purple (A), #2745 Filbert (B), #2721 Sprig (C), #2753 Agean Sea (D) and #2730 Teaberry (E)
Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUG
1 Set (4) double pointed knitting needles, size 3 (3.25 mm)
1 St marker
GAUGE
22 sts = 4”; 32 rows = 4” in St st on larger needles
TO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTE
Body of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.
BODY
With straight needles, using A, cast on 17 sts. Knit 1 row on WS. Work even in St st, following Chart 1 until 11 rows have been completed. Work even with D only until piece measures 2” from beg, end on WS.
Shape Neck: Next Row (RS): With D, k5, bind off center 7 sts, k to end.
Following Row: With D, p5, cast on 7 sts, p to end. Work even with D until back measures same as front to chart. Beg with Row 11, work chart backwards until Row 1 has been completed. Knit 1 row on WS. Bind off. Measure down 1” from neck on each side of back and front and mark for armholes.
SLEEVES
With RS facing, using straight needles and D, pick up and k11 sts between armhole markers. Purl 1 row. Working in St st, follow Chart 2 until 7 rows have been completed, end on WS. Purl 1 row on RS with A. Bind off.
FINISHING
Fold sweater in half and sew side and sleeve seams, matching colors.
Turtleneck: With RS facing, using dpn’s and E, beg at center back neck, pick up and k14 sts around entire neck edge. Divide sts onto 3 dpn’s. Mark for beg of rnd and carry marker up. Knit 12 rnds. Bind off. Roll turtleneck down to RS.
posted by
one ben bir sey
time:
10:00 AM
Wednesday, January 13, 2010
Minutia 09/ ZIGZAG STRIPED TURTLENECK
#6 ZIGZAG STRIPED TURTLENECKSkill level: Intermediate
SIZEApproximately 4½” wide (cuff to cuff) x 2½” high (with turtleneck rolled down)
MATERIALS1 Ball each BERROCO COMFORT DK (50 grs), #2722 Purple (A), #2745 Filbert (B), #2721 Sprig (C), #2753 Agean Sea (D) and #2730 Teaberry (E)Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUG1 Set (4) double pointed knitting needles, size 3 (3.25 mm)1 St marker
GAUGE22 sts = 4”; 32 rows = 4” in St st on larger needlesTO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTE
Body of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.
BODY
With straight needles, using A, cast on 17 sts. Knit 1 row on WS. Work even in St st, following Chart 1 until 11 rows have been completed. Work even with D only until piece measures 2” from beg, end on WS.
Shape Neck: Next Row (RS): With D, k5, bind off center 7 sts, k to end.
Following Row: With D, p5, cast on 7 sts, p to end. Work even with D until back measures same as front to chart. Beg with Row 11, work chart backwards until Row 1 has been completed. Knit 1 row on WS. Bind off. Measure down 1” from neck on each side of back and front and mark for armholes.
SLEEVES
With RS facing, using straight needles and D, pick up and k11 sts between armhole markers. Purl 1 row. Working in St st, follow Chart 2 until 7 rows have been completed, end on WS. Purl 1 row on RS with A. Bind off.
FINISHING
Fold sweater in half and sew side and sleeve seams, matching colors.
Turtleneck: With RS facing, using dpn’s and E, beg at center back neck, pick up and k14 sts around entire neck edge. Divide sts onto 3 dpn’s. Mark for beg of rnd and carry marker up. Knit 12 rnds. Bind off. Roll turtleneck down to RS.
posted by
one ben bir sey
time:
10:00 AM
Sunday, January 3, 2010
Minutia 09 / RED & WHITE STRIPED PULLOVER
Skill level: Easy
SIZEApproximately 4” wide (cuff to cuff) x 2¼” high
MATERIALS1 Ball each BERROCO COMFORT DK (50 grs), #2751 True Red (A) and #2703 Barley (B)Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGECrochet hook, size 3.75 mm (F-5)
GAUGE22 sts = 4”; 32 rows = 4” in St stTO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTEThe body of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.
BODY
With straight needles, using A, cast on 18 sts.
Ribbing: Row 1 (RS): K2, * p2, k2, rep from * across.
Row 2: P2, * k2, p2, rep from * across. Rep Rows 1 and 2 once more. Join B and, continuing to work in ribbing as established, work 4 rows B, 4 rows A, then 4 rows B.
Shape Neck: Next Row (RS): With A, work 6 sts, bind off center 6 sts, work to end.
Following Row: With A, work 6 sts, cast on 6 sts, work to end – 18 sts. (Work 4 rows B, the 4 rows A) twice, end on WS. Bind off in ribbing. Measure down ¾” from neck on each side of back and front and mark for armholes.
SLEEVES
With RS facing, using straight needles and B, pick up and k12 sts between armhole markers. Work even in k2, p2 ribbing for 3 rows, then join A and work even for 4 rows, end on WS. Bind off in ribbing.
FINISHING
Fold sweater in half and sew side and sleeve seams.
Neckband: With RS facing, using crochet hook, join A at center back neck, work in sc around entire neck edge, join with a sl st in first sc. DO NOT turn.
Rnd 2: Ch 1, work 1 sc in each sc around, join with a sl st in beg ch-1. Fasten off. Cut two 3” long strands each of A and B. Put strands tog and thread through center rib just below front neck. Tie strands tog as in photo.
http://www.lionbrand.com/
posted by
one ben bir sey
time:
10:00 AM
Wednesday, December 23, 2009
Minutia 09 / GOLD CABLED PULLOVER
Skill level: Intermediate
SIZEApproximately 4” across (cuff to cuff) x 2¾” high
MATERIALS1 Hank BERROCO LUMINA (25 grs), #1620 Gold CoastStraight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGECrochet hook, size 3.75 mm (F-5)Cable needle (cn)
GAUGE22 sts = 4”; 30 rows = 4” in St stTO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTEThe body of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.
STITCH GLOSSARY
CB6
Sl 3 sts to cn and hold in BACK, k3, k3 from cn
CABLE PATTERN (Worked over 18 sts)
Row 1 (RS): K3, p3, k6, p3, k3.
Row 2: P3, k3, p6, k3, p3.
Row 3: K3, p3, CB6, p3, k3.
Row 4: Rep Row 2.
Rep these 4 rows for Cable Pat.
BODY
With straight needles, cast on 18 sts.
Set-Up row (WS): P3, k3, p6, k3, p3. Work even in Cable Pat until piece measures approximately 2¼” from beg, end on Row 4 of Cable Pat.
Shape Neck: Next Row (RS): P3, k3, bind off 6 sts, work to end.
Following Row: K3, p3, cast on 6 sts, work to end – 18 sts. Continue to work in pat as established until piece measures approximately 2¼” from neck, end on WS. Bind off. Measure down 1” from neck on each side of back and front and mark for armholes.
SLEEVES
With RS facing, using straight needles, pick up and k11 sts between armhole markers.
Row 1 (WS): K1, * p1, k1, rep from * across. Rep this row until sleeve measures 1” from beg, end on WS. Bind off.
FINISHING
Fold sweater in half and sew side and sleeve seams.
Neck Edging: With RS facing, using crochet hook, join yarn at center back neck, work around entire neck in sc, join with a sl st in first sc. DO NOT turn. Work from left to right in Reverse Sc around entire neck, join with a sl st in first sc. Fasten off.
Lower Edging: Beg at side seam, work same as neck edging.
Optional: Sew small beads at neck as in photo.
www.lionbrand.com
posted by
one ben bir sey
time:
10:00 AM
Sunday, December 13, 2009
Minutia 09 /ROSE CABLED PULLOVER
#3 ROSE CABLED PULLOVER
Skill level: Intermediate
SIZEApproximately 3½” across (cuff to cuff) x 2½” long
MATERIALS1 Ball BERROCO COMFORT DK (50 grs), #2730 TeaberryStraight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGECrochet hook, size 3.75 mm (F-5)Cable needle (cn)
GAUGE22 sts = 4”; 32 rows = 4” in St stTO SAVE TIME, TAKE TIME TO CHECK GAUGE
CABLE PATTERN (Multiple of 5 sts + 2)
Row 1 (WS): K2, * p1TBL, k1, p1TBL, p2, rep from * across.
Row 2: P2, * k1TBL, p1, k1TBL, p2, rep from * across.
Row 3: Rep Row 1.
Row 4: P2, * sl 2 sts to cn and hold in FRONT, k1TBL; then sl the p st back to LH needle and purl it; then k1TBL from cn, p2.
Rep these 4 rows for Cable Pat.
NOTE
Body of this sweater is worked in one piece front lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.
BODY
With straight needles, cast on 17 sts. Work even in Cable Pat for 1½”, end on WS. Mark beg and end of last row for beg of armholes. Work even until piece measures approximately 2¼” from beg, end on Row 4 of Cable Pat.
Shape Neck: Next Row (WS): Working Row 1 of Cable Pat, work 5 sts, bind off center 7 sts, work to end.
Following Row: Work 5 sts, cast on 7 sts, work to end – 17 sts. Work even in pat as established until piece measures ¾” from neck. Mark beg and end of last row for end of armholes. Work even until piece measures 2¼” after neck, end on WS. Bind off.
SLEEVES
With RS facing, using straight needles, pick up and k11 sts between armhole markers.
Row 1 (WS): K4, p1TBL, k1, p1TBL, k4.
Row 2: P4, k1TBL, p1, k1TBL, p4.
Row 3: Rep Row 1.
Row 4: P4, sl 2 sts to cn and hold in FRONT, k1TBL; sl purl st back to LH needle and purl that st; k1TBL from cn; p4. Rep Rows 1 – 4 once more, then work Rows 1 – 3. Bind off.
FINISHING
Fold sweater in half and sew side and sleeve seams. Fold sleeve cuffs ¼” to RS.
Neck Edging: With RS facing, using crochet hook, join yarn at center back neck, work around entire neck in sc, join with a sl st in first sc. DO NOT turn. Work from left to right in Reverse Sc around entire neck, join with a sl st in first sc. Fasten off.
Lower Edging: Beg at side seam, work same as neck edging.
www.lionbrand.com
posted by
one ben bir sey
time:
10:00 AM
Thursday, December 3, 2009
Minutia 09 /ROSE OVERALLS
Skill level: Easy
SIZEApproximately 2” across x 4” high (including straps)
MATERIALS1 Hank BERROCO LUMINA (25 grs), #1655 De Wallen (A)1 Ball BERROCO COMFORT SOCK (100 grs), #1816 Cosmopolitan (B)Straight knitting needles, sizes 4 (3.50 mm) and 6 (4.00 mm) OR SIZE TO OBTAIN GAUGE1 St holder
GAUGE26 sts = 4”; 22 rows = 4” in k1, p1 ribbing on larger needlesTO SAVE TIME, TAKE TIME TO CHECK GAUGE
LEFT LEG
With larger straight needles, using A, cast on 15 sts. Knit 3 rows, dec 1 st each end of last row – 13 sts. Join B and work with both yarns held tog as follows:
Ribbing: Row 1 (RS): K1, * p1, k1, rep from * across.
Row 2: P1, * k1, p1, rep from * across. Rep these 2 rows 3 times more, end on WS. Sl sts onto holder.
RIGHT LEG
Work same as left leg until 6 rows of ribbing have been completed, end on WS – 13 sts.
Joining Row (RS): Work across 11 sts of right leg, p2 tog, then work 13 sts of left leg from holder – 25 sts. Work even in ribbing as established until piece measures 2” from beg, end on WS.
Dec Row (RS): Knit, dec 9 sts across – 16 sts. Beg with a p row, work even in St st until piece measures 2½” from beg, end on WS. Fasten off B. With A, k the next row, inc 3 sts across – 19 sts. Knit 2 rows. Bind off knitwise on WS.
FINISHING
Sew back seam to crotch. Sew inside leg seams.
Straps (Make 2): With smaller straight needles, using A, cast on 3 sts. Work even in St st for 4½”, end on WS. Bind off. Fold A waistband at top of pants down to RS and sew straps to front and back as shown in photo. Fold A edge at lower edge of each leg up to RS.
www.lionbrand.com
posted by
one ben bir sey
time:
11:23 AM
Friday, November 20, 2009
Minutia 09/GREEN CABLED PULLOVER
Skill level: Intermediate
SIZEApproximately 4” across (cuff to cuff) x 3” high
MATERIALS1 Ball BERROCO COMFORT DK (50 grs), #2721 SprigStraight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGE1 Set (4) double pointed knitting needles, size 4 (3.50 mm)Crochet hook, size 3.75 mm (F-5)Cable needle (cn)1 St marker
GAUGE22 sts = 4”; 32 rows = 4” in St st on larger needlesTO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTEBody of sweater is worked in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.
STITCH GLOSSARY
LT4KSl 3 sts to cn and hold in FRONT, k1, k3 from cn
RT4KSl 1 st to cn and hold in BACK, k3, k1 from cn
LT4PSl 3 sts to cn and hold in BACK, p1, p3 from cn
RT4PSl 1 st to cn and hold in FRONT, p3, p1 from cn
CB6Sl 3 sts to cn and hold in BACK, k3, k3 from cn
BODYFront: With straight needles, cast on 18 sts. Beg on WS, knit 2 rows, purl 1 row, knit 1 row, purl 1 row, end on WS.
Cable Pat: Row 1 (RS): K1, LT4K, k8, RT4K, k1.
Row 2: P2, LT4P, p6, RT4P, p2.
Row 3: K3, LT4K, k4, RT4K, k3.
Row 4: P4, LT4P, p2, RT4P, p4.
Row 5: K5, LT4K, RT4P, k5.
Row 6: Purl.
Row 7: K6, CB6, k6.
Row 8: Purl.
Row 9: Rep Row 7.
Row 10: P5, RT4P, LT4P, p5.
Row 11: K4, RT4K, k2, LT4K, k4.
Row 12: P3 RT4P, p4, LT4P, p3.
Shape Neck: Row 13 (RS): K2, RT4K, bind off 6 sts, sl st remaining on needle back to LH needle, LT4K, k2.
Back: Row 14: P2, p2 tog, p2, cast on 7 sts, p2, p2 tog, p2 – 17 sts.
Row 15: K5, p7, k5.
Row 16: P5, k7, p5. Rep Rows 15 and 16 until back measures same as front, end on Row WS. Knit 1 rows. Bind off. Measure down 1” from neck on each side of back and front and mark for armholes.
SLEEVES
With RS facing, using straight needles, pick up and k11 sts between markers. Beg with a p row, work even in St st for 1¼”, end on RS. Knit 1 row on WS. Bind off knitwise.
FINISHING
Turtleneck: With RS facing, using dpn’s, beg at center back neck, pick up and k15 sts around entire neck. Divide sts evenly on 3 dpn’s. Mark for beg of rnd and carry marker up. Knit 10 rnds. Bind off. Fold sweater in half and sew side and sleeve seams. Fold back sleeve cuffs ¼” to RS.
Belt: With crochet hook, make a chain 6” long. Fasten off. Starting at front, thread belt under center knot of cable. Even out so that there is an even length of belt on each side of cable. Thread ends of belt from RS to WS at side seams, then from WS to RS at each side of Reverse St st panel in center of back. Tie ends of belt tog in center.
posted by
one ben bir sey
time:
3:33 PM
Sunday, November 1, 2009
TEMARI BALLS
Materials:
foam ball 2-1/2 inches to three inches in diameter
polyester fiberfill batting
fine weight colored yarn
sewing thread - medium spool color to match yarn
DMC Pearl Cotton #5 in selected colors
gold or silver metallic thread
colored glass-headed pins
needles: yarn darners #18, 2-1/4-inch long with large eye
paper strips - 1 per ball, cut to measure 3/8-inch wide (paper cutter and 20 lb. bond copier paper work best)
Steps:
1. Cut two pieces of batting in 3" x 6" rectangles.
2. Place the rectangles on the foam ball so that their interlocking fit resembles the two pieces of a baseball cover that is sewn together.

3. Pin the batting in place and trim the corners of the rectangular pieces (figure A).
4. Randomly wrap enough colored yarn around the ball to cover the white color of the batting (figure A). Remove the pins.

5. Wrap random colors of sewing thread around the ball to cover the yarn. Stitch the ends of the thread into the ball.
6. Visually divide the ball into North and South hemispheres (figure B).

Measuring is the key to successfully dividing the ball. Anywhere on the ball, place a white pin on the spot where you want the North Pole to be.
7. Use the white pin at the North Pole to attach the end of a paper strip, folded to a 3/8-inch width, to the ball.
8. Wrap the paper strip around the middle of the ball so that the strip passes over the South Pole and ends at the North Pole (figure C). To obtain an accurate measurement of the circumference of the ball, repeat this step at several different longitudes. Stick the pin at the very tip of the paper, as indicated.
9. When you are satisfied with your measurement, cut off any excess paper on the strip, so that both ends meet exactly at the North Pole when the strip is wrapped around the ball.
10. With one end still attached to the North Pole, crease the strip in half. In other words, make a fold in the paper where it passes over the South Pole.
11. With scissors, place a tiny notch in the fold (figure D).

12. To find the best location for the South Pole on your ball, wrap the strip around the ball, and place a black pin at the notch you made in step 11. Check the pin placement by wrapping the strip around the ball at several different longitudes. Adjust the location of the black pin as needed. Be patient.
13. To find the Obi Line (i.e., the equator), fold the paper strip in half, and then halve it again (figure E).

14. With scissors, place a tiny notch in the fold.
15. Wrap the strip around the ball again, and place pins around the ball at the notches you made in Step 14 to delineate the equator.
16. Insert another white pin at the North Pole. Remove the first pin and the paper strip.
17. Fold the strip again, but this time in eighths. To do this, simply fold the strip in half three consecutive times.
18. With scissors, place a tiny notch in the fold.
19. Attach one end of the strip to the middle of the ball under one of the pins at the Equator (figure F).

20. Wrap the strip around the equator and attach it to the ball, with the equator pin opposite your beginning point.
21. Using your paper as your guide, create an even line around the ball by placing a pin at each eighth notch on the strip.
22. Using the pins as alignment and spacing guides, wrap metallic threads around the ball to create divisions (figure G).

Division threads are attached to the ball where they initially attach to the ball and where they end on the ball. They divide the ball into eight equal vertical sections resembling those of an orange.
23. Measure four wraps of thread around the circumference of the ball.
24. Thread your needle, and knot the thread's end.
25. Enter the needle at the North Pole pin.
26. Using the pins around the equator and the pin at the South Pole as guides, wrap the string around the ball four times so that you've created eight identical divisions around the ball.
27. Stitch the end of the thread into the North Pole.
28. Tack the North and South Pole intersections in place after you have created the sections.
29. Sewing an Obi Line around the equator will keep the eight longitudinal lines in place. Cut a length of thread that is three times the diameter of the ball. This is easily measured by wrapping the thread around the circumference of the ball three times.
30. Thread your needle, knot the thread's end, and sew the beginning of the thread into the ball at one of the pins delineating the equator.
31. Using the equator pins as your guide, wrap the thread once around the ball in a straight line.
32. Wrap the thread around the ball in the same fashion again, but this time, tack down the longitudinal lines from under the ball's surface at each place that they intersect the equator.
33. Repeat Step 31 with the remaining thread, and stitch the end of the thread into the ball at the point where it was first inserted into the ball.
34. Now you are ready to create adesign. One basic stitch will create most of your design. The basic stitch can take many shapes, a square, a zigzag, a triangle or a circle, just by changing its direction (figure H).

Most of the patterns are variations of the basic stitch. Because you're sewing on a ball and the surface threads are random, you can go in any direction. You are not limited to up-and-down , side-to-side or flat embroidery stitches (figure I).

35. Use colored pins to divide the lines again when you establish your pattern stitches.
36. Use a long needle to reach under the ball's surface. The needle must have a large eye to accommodate large thread: Pearl Cotton #5 and the metallic gold or silver thread that creates the design.
37. Apply layers of thread shapes using numerical order. Keep track of where you are by pinning little numbered tabs to the ball. These will keep you going in the right direction. It's as easy as following the dots!
38. There are simple tricks that guide threads: little gates to cross through or paper bridges to cross under or over (figure J).


Only three basic divisions make all the patterns: 1) the North Pole/South Pole/equator division, 2) a division that applies the six square sides of a cube, and 3) a division that applies pentagons. With these three divisions and the basic stitch, thousands of patterns have evolved. After a few basic lessons, you can begin to create your own patterns with your own colors. The combinations are endless.
posted by
one ben bir sey
time:
10:00 AM
Tuesday, October 20, 2009
Saturday, October 10, 2009
Thursday, October 1, 2009
Morning Glory /Akşam sefası
Flower
Using A, cast on 5 sts.
Slip sts onto 3 double-pointed needles and continue in rounds:
K 1 round.
2nd round Kfb 5 times. 10 sts.
K 4 rounds.
7th round Kfb 10 times. 20 sts.
K 8 rounds.
16th round [K1, kfb] 10 times. 30 sts.
K 4 rounds.
21st round [K2, kfb] 10 times. 40 sts.
K 2 rounds.
24th round [K3, kfb] 10 times. 50 sts.
K 2 rounds. 27th round [K4, kfb] 10 times. 60 sts.
K 3 rounds.
Bound-off round Bind off 5 sts, * return st on right-hand needle to left-hand needle and cast on 2 sts **, bind off 8 sts ***, repeat from * to *** 8 times, repeat from * to **, bind off 2 sts.
Fasten off.
Center
Using B, cast on one st. 1st row [K1, yo, k1, yo, k1] all in one st. 5 sts.
Beginning with a p row, work 2 rows st-st. 4th row P5tog.
Fasten off.
Stem
Using B and 2 double-pointed needles, cast on 4 sts. Make an i-cord (click here for directions) 1in. long.
Do not break yarn.
Sepals
[K1, yo, k1, yo, k1, yo, k1] in each st, turn. 28 sts.
Bind off.
Finishing
Sew center inside flower and join sepals to flower.
Leaf Using B and pair of knitting needles, cast on 3 sts.
1st row K.
2nd and WS rows P.
3rd row Kfb twice, k1. 5 sts.
5th row K1, kfb twice, k2. 7 sts.
7th row K2, kfb twice, k3. 9 sts.
9th row K3, kfb twice, k4. 11 sts.
11th row K4, kfb twice, k5. 13 sts.
13th row K5, kfb twice, k6. 15 sts.
15th row K6, kfb twice, k7. 17 sts.
17th row K7, kfb twice, k8. 19 sts.
19th row K8, kfb twice, k9. 21 sts.
21st row K3, [slip 1 knitwise] twice, * lift 2nd st on left-hand needle over first st and slip this st purlwise, lift 2nd slip st over purlwise slip st and return st to left-hand needle **, repeat from * once **, k2, kfb twice, k3, [slip 1 knitwise] twice, repeat from * to ** twice, k3. 15 sts. 1st side. Next row (WS) P7, turn. Next row K1, [slip 1 knitwise] twice, repeat from * to ** of 21st row twice, k2. 3 sts.
Bind off.
With WS facing, slip center st and work 2nd side as 1st side on remaining 7 sts. Stem Join B to center st and make 6 chain sts. Fasten off. Finishing Join leaf to flower stem, darning end in chain to strengthen stem.
ABBREVIATIONS/REFERENCES
k=knit
kfb=knit into front and back stitch
ch=chain(crochet)
st(s)=stitch(es)
p=purl
yo=yarn over
posted by
one ben bir sey
time:
10:00 AM
Wednesday, September 23, 2009
Lily /Zambak
Stitch Explanation: KPK = Knit, purl, knit into the same stitch. S2KPO = Slip two stitches as if to knit two together, knit one, pass the slipped stitch over
ABBREVIATIONS / REFERENCES
k = knit
posted by
one ben bir sey
time:
10:00 AM
Wednesday, September 16, 2009
Wednesday, September 9, 2009
KİTAP
Kitap hamilelik boyunca her hafta için yoga hareketleri ve meditasyon içeriyor. Bununla birlikte bebeğin dilinden her haftaki gelişimini anlatıyor, boyu, kilosu, organ gelişimleri vb...
Yoga hareketleri fotoğraflarla anlatılıyor. Bunun yanısıra yoga posteri var, posterde hafta hafta yoga hareketleri çizimlerle anlatılıyor, dilediğiniz bir yere asıp yoga yapabilmeniz için pratik bir çözüm
Dr. Ender Saraç'ın hamileler için hazırladığı bir beslenme önerileri bölümü var, orda hamilelikte nasıl beslenmek gerektiğini, hangi aylarda nelere dikkat etmek gerektiğini anlatıyor.
posted by
one ben bir sey
time:
1:27 PM
Tuesday, September 8, 2009
Loop Edge Fringe
Skill level: Easy
Knotting tassels on a loop-edged braid is another way to make a decorative fringe.
Method Cast on 4 sts.
1st row (RS) Yo, k 2 tog, k 2.
2nd row Slip 1, k 3.
Repeat 1st and 2nd rows.
Bind off.
Tassels Cut 4 in (10 cm) lengths of yarn - two for each tassel. Double two strands. With wrong side facing, insert crochet hook in one edge loop and, hooking the fold of the strands, pull a loop through. Use the hook to pull the ends through the tassel loop. Pull the ends gently to tighten the knot.When all tassels are completed, trim the fringe.
ABBREVIATIONS /REFERENCES
k=knit
yo=yarnover
k2tog=knit2together
posted by
one ben bir sey
time:
10:00 AM
Tuesday, September 1, 2009
Garter stitch Loops
Skill Level : Intermediate
This is simply a garter stitch fringe caught up after a few rows to form loops.
Method Cast on 4 sts.
1st row (RS) Slip 1, k 3.
2nd row Slip 1, k 3.
3rd row Cast on one st by working k in the next st without slipping it off, transfer the new st from the right-hand to the left-hand needle; inserting the needle between the first 2 sts on left-hand needle each time, cast on 6 more sts in this way, making a total of 11 sts; bind off 7 sts, k to end.
4 sts. 4th, 5th, 6th, 7th, and 8th rows Slip 1, k 3.
9th row With right-hand needle pick up 2 strands of last cast-on st, k first st on left-hand needle then slip strands over this st, k to end. 10th row Slip 1, k 3.
Repeat 1st-10th rows, ending with a 1st pattern row.
Bind off.
REFERENCE
Garter Stitch
Trim directions reproduced by permission from 150 Knitted Trims by Leslie Stanfield, St. Martin's Griffin, 2007
posted by
one ben bir sey
time:
10:00 AM
Tuesday, August 25, 2009
Popcorn Fringe
ABBREVIATIONS/REFERENCES
posted by
one ben bir sey
time:
10:00 AM






















